August 12, 2009
The parking lot project is far enough along that we may be able to use it soon! Check it out:

Nearing completion
I’m so pleased with the way our church is responding to the school supplies project. This past weekend, the SLP lobby was full of PowerPacks complete with supplies. Way to go SLP!

Putting smiles on children's faces
Leave a Comment » |
Construction, Generosity, God's Amazing Church, Local Impact, Uncategorized |
Permalink
Posted by swhicker
August 3, 2009
If you were at the Spring Lake Park campus over the weekend, you probably noticed the construction equipment, survey stakes and piles of drainage pipe. What does it all mean? It’s a sign of progress—we’re on our way toward the expansion of our paved parking.
The parking lot is one of the final projects from the God’s Amazing Church (GAC) campaign. People have been making generous contributions to the GAC over the past three years. And we’re grateful for those who’ve contributed.
When the lot is finished, we’ll have year-round use of the additional parking spaces that we’ve desperately needed since the SLP campus opened in December of 2007. We’re expecting the new lot to be available by the end of August.
Check out this picture of the project:

More Parking Spaces are Coming
Leave a Comment » |
Church, Construction, Generosity, God's Amazing Church, Summer, Uncategorized |
Permalink
Posted by swhicker